Consultation
Engineering-first advice on lighting, solar & power, and intelligent infrastructure: what the site actually requires, and how to prove a solution will deliver it.
Get it right the first time.
Poor design, selection and specification quietly create cost, liability and missed savings. Decisions about lighting, power and smart infrastructure touch:
- Bottom line
- Safety
- Productivity
- Environment
- Health
Three areas, one engineering team.
Lighting
- Light levels and uniformity
- Glare and light trespass
- Fixture selection and specification
Solar & power
- Load and demand
- Storage and autonomy
- On-grid, off-grid or hybrid
Intelligent infrastructure
- Connectivity and platform
- Working with existing systems
- Data you can act on
Common to all three Standards and regulatory compliance. We know the industry standards, recommended practices, codes and utility requirements that govern your site, and we document how the design meets each one.
Requirement first. Equipment second.
Price-driven
Engineering-first
A spec sheet
Starts with
What the site requires
The lowest upfront price
Decides on
A proven design
Performance on day one
Designs for
Performance maintained year after year
The data sheet’s claims
Proves performance with
Simulation before, measurement after
Assumed from the data sheet
Compliance
Documented against each standard
The equipment
Counts the cost of
Energy and maintenance over its life
Rework, early replacement and missed savings
Result
No surprises, no rework: the right solution first time
What it costs over its life.
The fixture is the smallest part of the bill. Energy, maintenance and rework decide what a project really costs.
Illustrative. Proportions differ on every project.
A business model that makes sense.
We look at the whole project: what goes in, and everything it can give back, from safety and efficiency to opportunities no one had spotted.
- Requirement
- Design
- Equipment
- Financing
- Energy and maintenance savings
- Operational efficiencies
- Insight and hidden opportunities
- New smart and IoT applications
Modelled before it is bought. Measured once it is built.
- 01DefineThe levels, loads or data the site needs.
- 02SimulateThe design is modelled before anything is bought.
- 03InstallBuilt and installed to the design.
- 04VerifyMeasured on site against the requirement.
- Independent test reports
- Certifications
- Industry standards and recommended practices
- Codes and utility requirements
Everything the project needs, nothing it does not.
- With a CONXCORP project
- Or on its own
- Requirements briefWhat the site must achieve, in writing.
- Design and simulationPhotometric, power or system design, modelled.
- SpecificationWhat to buy, and why.
- Compliance and submittal reviewChecked before it is approved.
- Post-installation verificationMeasured, not assumed.
- TrainingFor your team, in every category we supply.


Six questions worth asking.
We answer every one of them before anything is bought.
- RequirementAre we designing to what the site needs, or just replacing what is there?
- ValueAre we buying on lowest price, or on value over the life of the system?
- RiskCould this choice expose us to safety or liability risk?
- ComplianceDoes it meet every standard, code and utility requirement that applies?
- ProofWhat proves it will perform, on day one and for years after?
- IntegrationWill it work with what we have today, and what we add tomorrow?